NEW QUESTION # 44
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SWPM using the Load procedure
- B. SWPM using the Backup / Restore procedure
- C. SUM with DMO
- D. SUM without DMO
Answer: A
NEW QUESTION # 45
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Standalone AS ABAP with SAP_BASIS 752 and above
- B. SAP Solution Manager 7.2
- C. SAP ECC system from SAP ERP 6.0 EHP 8
- D. SAP S/4HANA Server 1809 and above
Answer: A,D
NEW QUESTION # 46
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
- B. AA
Answer: A
NEW QUESTION # 47
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The end of the database migration
- B. The start of the Execution roadmap step
- C. The end of the business downtime
- D. The start of the business downtime
Answer: C
NEW QUESTION # 48
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- C. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- D. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
Answer: C
NEW QUESTION # 49
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
- A. Table contents compare
- B. Table count verification
- C. DMO with system move
- D. Migration repetition option
Answer: C
NEW QUESTION # 50
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. An SAP S4HANA 1709 sandbox system
- B. A Standalone SAP system with ABAP 7.51 or above
- C. AA
Answer: A,B
NEW QUESTION # 51
What do you do to prepare the database migration option of a SUM procedure?
There are 3 correct answers
Response:
- A. Extract the SAP HANA client installation archive
- B. Move the R3trans update archive into the download folder
- C. Extract the SAP HANA database installation archive
- D. Move the SAPM update archive into the download folder
- E. Move the stack.xml update file into the download folder
Answer: A,D,E
NEW QUESTION # 52
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Perform the migration of data into the new data structure
- B. Apply the recommendations of the simplification list
- C. Run the database migration to the SAP HANA database
- D. Check the compatibility of custom code with SAP S/4HANA
Answer: B,D
NEW QUESTION # 53
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?
- A. Using R3load and memory pipes
- B. Using R3load and network socket connection
- C. Using R3load and file transfer
- D. Using work processes and network socket connection
Answer: A
NEW QUESTION # 54
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_CLONE_MIG_SOT_RUN
- B. EU_IMPORT_ALL
- C. EU_CLONE_MIG_DT_CREATE
- D. EU_CLONE_MIG_DT_RUN
Answer: D
NEW QUESTION # 55
ICNV initialization does 3
- A. Build index on flag column
- B. Creation of views
- C. Creation of flag
- D. AA
Answer: A,B,C
NEW QUESTION # 56
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
&UC) procedure. - C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
Answer: C
NEW QUESTION # 57
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the job log for the corresponding job in SM37 (Job Overview)
- B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- C. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
- D. In the corresponding R3trans log files of this phase
Answer: A,C
NEW QUESTION # 58
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
- A. Perform an SAP S/4 HANA conversion without DMO
- B. Perform an SAP S/4 HANA conversion including DMO
- C. Upgrade the SAP system
- D. Apply SAP support packages
- E. Use DMO for SUM
Answer: C,D,E
NEW QUESTION # 59
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Activate the required business functions manually in the production system.
- B. Specify the business functions that need to be switched on during the prepare part of SUM.
- C. Import a transport request from the development system that contains the recording of the activation.
- D. During conversion, SUM delivers some business functions already activated.
Answer: C,D
NEW QUESTION # 60
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. MIGRATE J5T_DUR_XML file from a previous run
- B. Stack XML file calculated by the Maintenance Planner
- C. Breakpoint configuration file SAPUPPHAS.BRK
- D. Parameter file SAPup_add.par
Answer: A,B
NEW QUESTION # 61
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. You need to build up an SI check framework by applying SAP Notes
- B. The SI checks are executed in the development system and the results are transported into the subsequent systems
- C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
- D. The errors from the SI checks must be solved, otherwise. SUM will report an error
Answer: A,C
NEW QUESTION # 62
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:
- A. The Application Guide
- B. The major SUM Guide
- C. The SAP S/HANA Conversion Guide
- D. The DMO Guide
Answer: C,D
NEW QUESTION # 63
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Conversion
- B. Main import
- C. Migration
- D. Software update
Answer: A,C
NEW QUESTION # 64
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correctanswers to this question.
Response:
- A. Check the "Charts Control Center" in the SUM UI
- B. Check the log files written under "SUM\abap\log"
- C. Check logs for jobs starting with "RSUPG_SGEN" in the system
- D. Check the dump size of the database export on disk
Answer: A,B
NEW QUESTION # 65
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: B